Is plug-in solar legal in my state?
The short answer
In a growing number of states, yes, with conditions.
Plug-in solar, also called balcony solar, is a small solar kit that plugs into an ordinary outlet. We have read the law itself in all ten states that have passed one. Six are in force. California’s, New Hampshire’s and Virginia’s start on January 1, 2027, and New Jersey’s on March 1, 2027. We are also checking every other state for bills: Texas and Florida have none, and in several more a bill has been introduced or has failed. Most set a limit of 1,200 watts and require a kit certified by a recognized safety lab. Pick your state below to see what applies.
We do not sell kits. Every rule on this page comes from our own reading of the state’s enacted law on its legislature’s website, with the date we read it. Where we have only seen news reports, we say so and show no details until we have read the law ourselves.
State by state
- 6 in force
- 4 signed, not yet in force
- 1 passed but not signed
- 11 with a bill in progress
- 13 where a bill failed
- 12 checked, no bill
Colorado In force
In force since August 12, 2026
- Law
- HB26-1007
- Signed
- May 7, 2026
- Limit
- 1,920 W maximum output to the grid; one system per address
- Kits must be labeled and listed by a nationally recognized testing laboratory.
- Only one kit may be connected to a single wall outlet per address.
- The utility cannot require approval, fees or extra equipment, but may ask you to tell it the kit is there and its size.
- From January 1, 2027, homeowners' associations cannot prohibit a kit; owners may have to secure it and may be responsible for its costs and liability.
- Installation must follow fire and building codes.
Checked on the Colorado legislature’s website on October 8, 2026: the official record
Connecticut In force
In force since October 1, 2026
- Law
- Public Act 26-127 (HB 5340), section 9
- Signed
- June 4, 2026
- Limit
- 1,200 W maximum output, through a standard 120 V outlet; one device behind each meter
- Kits must be certified by UL or an equivalent lab and meet UL 1741, IEEE 1547 and the National Electrical Code.
- Kits must carry a warning that power exceeding your use is charged to you as usage unless you have a net metering meter.
- The utility cannot require approval, fees (other than charges from the kit's use) or extra equipment.
- Building, fire safety and local codes still apply.
Read the full Connecticut page
Checked on the Connecticut legislature’s website on October 8, 2026: the official record
Maine In force
In force since July 29, 2026
- Law
- Public Law 2026, chapter 644 (LD 1730)
- Signed
- April 6, 2026
- Limit
- Up to 420 W per address on your own; up to 1,200 W if installed by a licensed electrician
- Covers plug-in batteries as well as plug-in solar.
- Kits must be listed to UL 3700 or a comparable standard, or configured to the National Electrical Code.
- Over 420 W: a Maine-licensed electrician, a dedicated circuit with a single outlet, and notifying the utility within 30 days.
- The utility cannot require approval, an interconnection application, fees or extra equipment.
- Cannot be used for net energy billing.
- If you do not own the building, the installation must not damage it, and you must restore it when you remove the kit.
Checked on the Maine legislature’s website on October 8, 2026: the official record
Maryland In force
In force (signed May 12, 2026)
- Law
- Chapter 353 of 2026 (HB 1532), section 7-321
- Signed
- May 12, 2026
- Limit
- 1,200 W maximum back to the building; one system per electric meter; homes only
- Kits must be certified by UL or an equivalent lab.
- You must notify the utility before installing and give it a certification of the kit's safety features and capacity.
- If an automatic locking disconnect switch is required, you pay for it.
- The utility cannot require approval or charge for feeding power back.
- Not part of net metering and earns no renewable energy credits.
Checked on the Maryland legislature’s website on October 8, 2026: the official record
Utah In force
In force since May 7, 2025
- Law
- HB 340 (2025), Utah Code 54-15-102 and 54-15-601
- Signed
- March 25, 2025
- Limit
- 1,200 W maximum output, through a standard 120 V outlet
- Kits must meet the National Electrical Code and be certified by UL or an equivalent nationally recognized testing laboratory.
- Kits must stop feeding the building's wiring during a power outage.
- The utility cannot require approval, any fee or charge related to the kit, or extra equipment.
- Kits are exempt from interconnection rules and are not part of net metering.
- The utility is not liable for damage or injury caused by a kit.
Checked on the Utah legislature’s website on October 8, 2026: the official record
Vermont In force
In force since July 1, 2026
- Law
- Act 149 of 2026 (S.202)
- Signed
- June 16, 2026
- Limit
- 1,200 W combined inverter capacity per electric meter
- Kits must comply with UL 3700 (or an equivalent certification) and IEEE 1547‑2018 settings.
- Only allowed on homes with a smart meter.
- No utility approval, installation fee or extra equipment can be required, but the utility may recover costs if a kit overloads the service.
- Not allowed alongside a net metering system, and power sent to the grid is not paid for.
- The kit must be temporarily but securely attached to the ground or a structure.
- Renters give the landlord 10 days' notice; the landlord may set reasonable conditions.
- Local bylaws and deed restrictions cannot prohibit a kit.
Checked on the Vermont legislature’s website on October 8, 2026: the official record
California Law passed, starts soon
Law signed; starts January 1, 2027
- Law
- Chapter 985 of 2026 (SB 868)
- Signed
- September 30, 2026
- Limit
- 1,200 W maximum AC output per dwelling, through a receptacle
- Kits must be certified as a plug-in PV system by UL or an equivalent lab, meet the electrical codes, and include certified protection against feeding the grid in an outage.
- Utilities cannot require approval, fees or extra equipment.
- Utilities may ask you to register the kit on a simple online form (address, make, model and size).
- These exemptions end on January 1, 2030.
- From January 1, 2030, plug-in kits that do not meet the safety requirements cannot be sold in California.
Checked on the California legislature’s website on October 8, 2026: the official record
New Hampshire Law passed, starts soon
Law signed; starts January 1, 2027
- Law
- Chapter 262 of 2026 (SB 540)
- Signed
- July 2, 2026
- Limit
- 1,200 W maximum inverter output (AC); one system per metered customer
- Kits must be certified by a nationally recognized testing laboratory to the safety standards for plug-in solar.
- The utility cannot require approval, an interconnection review or agreement, fees (other than charges from the kit's use) or extra equipment.
- The utility may set up a way for you to tell it the kit's wattage after you install it, for information only.
- Kits must be installed and used following the state building code and the maker's instructions. The building code rules for plug-in kits start only once the state Department of Energy certifies that a national standard exists.
- The Department of Energy must publish consumer guidance, including that an unlisted or wrongly connected kit may affect your home or renters insurance.
- The legislature's docket shows a different start date; the law's own text says January 1, 2027, which is the date we show.
Read the full New Hampshire page
Checked on the New Hampshire legislature’s website on October 8, 2026: the official record
New Jersey Law passed, starts soon
Law signed; starts March 1, 2027
- Law
- P.L.2026, c.82 (S2368), the Garden State Balcony Solar Act
- Signed
- September 1, 2026
- Limit
- 1,200 W combined per service address (per dwelling unit in multi-family housing), through a standard 120 V outlet
- The law starts six months after it was signed on September 1, 2026.
- Kits must be listed or certified to UL 3700 or a comparable standard by a nationally recognized testing laboratory, and must stop exporting power during an outage.
- The utility cannot require approval, any fee or charge related to the kit, or extra equipment. Kits are exempt from interconnection agreements and net metering.
- Kits must follow their listing, the National Electrical Code and the state construction code, though kits of 400 W or less to the outlet are exempt from rules that would require changes to wiring or panels.
- Landlords cannot ban a kit within a tenant's home, including a balcony or patio, if the tenant pays their own electric bill, but can set reasonable rules. Tenants give 14 days' written notice.
- Towns cannot ban kits on homes or require a permit or fee to place or use one, and homeowners' associations cannot enforce bans, though both may set reasonable rules.
Checked on the New Jersey legislature’s website on October 8, 2026: the official record
Virginia Law passed, starts soon
Law passed; starts January 1, 2027
- Law
- Chapter 1052 of 2026 (HB 395)
- Signed
- April 22, 2026
- Limit
- 1,200 W per customer (per unit in multi-family housing), through an electrical outlet
- Kits must be certified by a nationally recognized testing laboratory and meet the National Electrical Code.
- You must notify your utility on the state's form before installing; the utility has 15 days to respond.
- The utility cannot require approval, fees or extra equipment, but may fit a locking disconnect switch in some cases.
- Landlords with more than four units cannot ban tenants from using a kit outside their unit, but can set reasonable rules; tenants give 7 days' notice.
- Localities cannot prohibit a kit, but homeowners' association and condominium rules still apply.
- Not part of net metering.
Checked on the Virginia legislature’s website on October 8, 2026: the official record
New York Not yet law
Passed the legislature; not yet signed by the Governor
- Law
- SUNNY Act (A.9111-C / S.8512-C)
- Both houses passed the SUNNY Act (Solar Up Now NY Act) on May 28, 2026.
- The legislature's record shows it has not been delivered to or signed by the Governor as of October 15, 2026, so it is not law yet.
- If signed, it would allow plug-in kits of up to 1,200 W through a standard outlet, listed by a nationally recognized testing laboratory as a complete system, that cut out during an outage.
- Utilities could not require approval, fees or extra equipment, and owners would have to tell their utility within 30 days of installing. It would take effect 90 days after becoming law.
Checked on the New York legislature’s website on October 15, 2026: the official record
Delaware Bill in progress
Bill in progress: in committee since March 2026
- Law
- SB 270 (2026)
- SB 270 would allow plug-in solar of up to 800 W per meter through a standard outlet.
- It has been awaiting consideration in the Senate committee since March 26, 2026.
- It is not law.
Checked on the Delaware legislature’s website on October 15, 2026: the official record
District of Columbia Bill in progress
Bill in progress: in committee since March 2026
- Law
- B26-0602, GRID Amendment Act of 2026
- B26-0602 would free plug-in ("portable") solar from interconnection and net metering rules, unless the owner chooses to join them, and stop the electric company requiring approval, fees or extra equipment.
- Kits would have to meet the National Electrical Code, be certified by UL or an equivalent laboratory, and cut out in a power outage. The bill text we read sets no wattage limit.
- It was referred to the Committee on Transportation and the Environment on March 3, 2026, which gave notice of a public hearing. It is not law.
Read the full District of Columbia page
Checked on the DC Council’s website on October 15, 2026: the official record
Georgia Bill in progress
Bill introduced; no action since February 2026
- Law
- HB 1304 (2025-2026 session)
- HB 1304 would exempt portable solar devices below 1,200 W from interconnection requirements, stop electric service providers requiring conditions before they are used, and limit liability.
- It was read for the second time in the House on February 18, 2026, and the legislature's record shows no action since.
- It is not law.
Checked on the Georgia legislature’s website on October 15, 2026: the official record
Illinois Bill in progress
Bills stalled: four bills sent back to committee after missing 2026 deadlines
- Law
- SB 3104, HB 4524, HB 4371 and HB 4516 (104th General Assembly)
- SB 3104 went furthest: the Senate energy committee passed it 9 to 4 on March 12, 2026, but it never got a vote of the full Senate.
- As amended, SB 3104 would require kits certified by UL or an equivalent laboratory, and would not allow kits over 391 W until the National Electrical Code covers them.
- All four bills were sent back to the House Rules or Senate Assignments committee after missing deadlines (SB 3104 on May 22, 2026). Illinois bills can be revived until the current General Assembly ends.
- None is law.
Checked on the Illinois legislature’s website on October 15, 2026: the official record
Massachusetts Bill in progress
Bill in progress: plug-in solar is part of an energy bill now in conference committee
- Law
- H.5175 (2025-2026)
- The House and Senate passed different versions of an energy bill, H.5175, that include plug-in solar.
- A conference committee to settle the differences was appointed on July 16, 2026.
- It is not law yet.
Read the full Massachusetts page
Checked on the Massachusetts legislature’s website on October 15, 2026: the official record
Michigan Bill in progress
Bill in progress: in committee since March 2026
- Law
- HB 5764 (2026)
- HB 5764 would add rules for small portable solar generation devices to Michigan's energy law (2008 PA 295).
- It was introduced and referred to the House Energy committee on March 19, 2026, and has not moved since.
- The legislature is still in session. The bill is not law.
Checked on the Michigan legislature’s website on October 15, 2026: the official record
North Carolina Bill in progress
Bill in progress: filed in April 2026, in a House committee
- Law
- H1129 "Balcony Solar" (2025-2026)
- H1129 would allow portable solar devices of up to 1.2 kW through a standard 120-volt outlet, certified by UL or an equivalent nationally recognized testing laboratory.
- Utilities could not require an interconnection agreement, approval or any fee for one.
- Landlords with more than four rental homes could not ban a tenant's device; the tenant would have to give seven days' notice.
- It was referred to the House Rules committee on April 30, 2026. It is not law.
Read the full North Carolina page
Checked on the North Carolina legislature’s website on October 15, 2026: the official record
Ohio Bill in progress
Bill in progress: two matching bills in committee since March 2026
- Law
- SB 383 and HB 755 (136th General Assembly)
- SB 383 and HB 755 carry the same title: they would add rules for "portable solar generation devices" to Ohio law.
- HB 755 was referred to the House Energy committee on March 18, 2026, and SB 383 to the Senate Energy committee on March 25, 2026. Neither has moved since.
- Neither is law.
Checked on the Ohio legislature’s website on October 15, 2026: the official record
Pennsylvania Bill in progress
Bill in progress: in committee since October 2025
- Law
- HB 1971 (2025-2026)
- HB 1971 would add rules for "portable solar generation systems" to Pennsylvania's public utility law. Its sponsor's memo to colleagues is titled "Reducing Barriers to Plug-In Solar".
- It was referred to the House Energy committee on October 28, 2025 and has not been reported out.
- It is not law.
Read the full Pennsylvania page
Checked on the Pennsylvania legislature’s website on October 15, 2026: the official record
Rhode Island Bill in progress
Bill passed the House in June 2026; in Senate committee since
- Law
- H 7269 Sub A (2026)
- H 7269 would let plug-in ("portable") solar devices of up to 1,200 W connect through a standard 120 V outlet without utility approval, fees or extra equipment, and keep them out of net metering.
- The House passed an amended version on June 9, 2026. It was sent to the Senate Environment and Agriculture committee the same day, with no action since.
- Two Senate bills on the same subject, S 2658 and S 2359, were held for further study in April 2026. None is law.
Read the full Rhode Island page
Checked on the Rhode Island legislature’s website on October 15, 2026: the official record
South Carolina Bill in progress
Bill in progress: in committee since January 2026
- Law
- H 4579 (2025-2026)
- H 4579 would stop deeds, covenants and homeowners' associations from banning balcony solar panels.
- It has sat in the House Labor, Commerce and Industry committee since January 13, 2026.
- It is not law.
Read the full South Carolina page
Checked on the South Carolina legislature’s website on October 15, 2026: the official record
Alaska Bill failed
Bills failed in 2026
- Law
- HB 257 and HB 369 (2026)
- HB 257 and HB 369 would have regulated portable solar generation devices.
- Neither left committee before the 2026 regular session ended.
- There is no plug-in solar law in Alaska.
Checked on the Alaska legislature’s website on October 9, 2026: the official record
Arizona Bill failed
Bills failed in 2026
- Law
- HB 2843 and SB 1606 (2026)
- HB 2843 (portable solar power devices) was held in its House committee on February 17, 2026. SB 1606 (plug-in solar energy) was held in its Senate committee without a hearing.
- The 2026 session ended on June 13, 2026, so both bills died.
- There is no plug-in solar law in Arizona.
Checked on the Arizona legislature’s website on October 15, 2026: the official record
Hawaii Bill failed
Bills failed in 2026
- Law
- SB 2902 and six other 2026 bills
- Seven 2026 bills dealt with plug-in or portable solar devices. The furthest, SB 2902, would have let condominium owners use a portable solar device with no utility approval, fee or extra equipment, registered online with the Public Utilities Commission.
- SB 2902 passed the Senate 25-0 on March 10, 2026. The House amended it at second reading on March 19, 2026 and sent it to its consumer protection committee, and it went no further.
- None of the seven is on the legislature's list of 2026 bills that passed final reading. The 2026 session calendar set adjournment for May 8, 2026.
- There is no plug-in solar law in Hawaii.
Checked on the Hawaii legislature’s website on October 19, 2026: the official record
Idaho Bill failed
Bill failed in 2026
- Law
- H0612 (2026)
- H0612 would have exempted portable solar generators from regulation as public utilities. It was sent to the State Affairs committee on February 11, 2026 and went no further.
- The 2026 session adjourned on April 2, 2026, so the bill died.
- There is no plug-in solar law in Idaho.
Checked on the Idaho legislature’s website on October 15, 2026: the official record
Indiana Bill failed
Bills failed in 2026
- Law
- SB 74 and HB 1084 (2026)
- SB 74 (plug-in home solar units) and HB 1084 (plug-in solar power systems, up to 1,200 W through a standard outlet) would have stopped electricity suppliers requiring approval, fees or extra equipment.
- The legislature now marks both bills "Inactive": they missed the deadlines a bill must meet to stay alive in the 2026 session.
- There is no plug-in solar law in Indiana.
Checked on the Indiana legislature’s website on October 15, 2026: the official record
Iowa Bill failed
Bill failed in 2026
- Law
- HF 2046 (2026)
- HF 2046 was introduced on January 14, 2026 and never left the Commerce committee.
- The legislature adjourned on May 2, 2026, so the bill died.
- There is no plug-in solar law in Iowa.
Checked on the Iowa legislature’s website on October 9, 2026: the official record
Minnesota Bill failed
Bills failed in 2026
- Law
- HF 3555 and SF 3873 (2026)
- HF 3555 and its Senate companion SF 3873 would have regulated the installation and operation of plug-in solar devices. Neither left its first committee.
- The legislature adjourned for good on May 18, 2026, ending its two-year session, so both bills died. The next session starts on January 12, 2027.
- There is no plug-in solar law in Minnesota.
Checked on the Minnesota legislature’s website on October 15, 2026: the official record
Missouri Bill failed
Bills failed in 2026
- Law
- HB 2444 and HB 2528 (2026)
- HB 2444 and HB 2528 would have exempted portable solar generation devices from Public Service Commission regulation.
- Both were sent to the House Emerging Issues committee on May 15, 2026. Missouri's constitution tables every bill still on the calendar after 6 p.m. on the first Friday after the second Monday in May, which in 2026 was May 15, so both died.
- There is no plug-in solar law in Missouri.
Checked on the Missouri legislature’s website on October 15, 2026: the official record
New Mexico Bill failed
Bill failed in 2026
- Law
- SB 157 (2026)
- SB 157, "Use of portable solar generation devices", was introduced on January 26, 2026 and sent to the Senate Conservation committee.
- The legislature's record marks it "Died".
- There is no plug-in solar law in New Mexico.
Checked on the New Mexico legislature’s website on October 15, 2026: the official record
Oklahoma Bill failed
Bill failed in 2026
- Law
- HB 4060 (2026)
- HB 4060 passed the House 88 to 4 on March 24, 2026, then stalled in the Senate Energy committee.
- The 2026 session has adjourned, so the bill died.
- There is no plug-in solar law in Oklahoma.
Checked on the Oklahoma legislature’s website on October 9, 2026: the official record
Oregon Bill failed
Bill failed in 2026
- Law
- HB 4080 (2026)
- HB 4080 would have let a household install and use portable solar devices of up to 1,200 W in total.
- It had a public hearing on February 5, 2026, and the legislature's record says "In committee upon adjournment" on March 6, 2026, so it died.
- There is no plug-in solar law in Oregon.
Checked on the Oregon legislature’s website on October 15, 2026: the official record
Washington Bill failed
No law: the plug-in solar section was cut from the bill that passed
- Law
- HB 2296 (Chapter 136, Laws of 2026)
- HB 2296 started with a plug-in solar section, but it was removed before the bill passed.
- The law that was signed (Chapter 136, Laws of 2026) contains no plug-in solar provision, so trackers listing Washington as legal are wrong.
- A second bill, SB 6050, died when the 2026 session ended.
Checked on the Washington legislature’s website on October 9, 2026: the official record
Wyoming Bill failed
Bill failed in 2026
- Law
- HB 146 (2026)
- HB 146, the Affordable Electricity Act of 2026, would have allowed plug-in solar of up to 1,200 W per meter through a standard 120 V outlet.
- It died in committee on March 3, 2026.
- There is no plug-in solar law in Wyoming.
Checked on the Wyoming legislature’s website on October 9, 2026: the official record
Alabama No bill
No law and no bill
- Law
- None found
- We searched the full text of every Alabama bill for "solar" and "photovoltaic" and read the 2025 and 2026 results. All seven are about solar farms and large solar facilities, or converting old oil and gas wells, not plug-in solar.
- Until a law passes, ask your utility before you plug anything in.
Checked on the Alabama legislature’s website on October 19, 2026: the official record
Arkansas No bill
No law and no bill
- Law
- None found
- We searched the full text of every bill in the 2025 Regular, 2026 Fiscal and 2026 First Extraordinary Sessions for the phrases "portable solar", "plug-in solar", "balcony solar" and "solar generation device" and found none.
- Until a law passes, ask your utility before you plug anything in.
Checked on the Arkansas legislature’s website on October 19, 2026: the official record
Florida No bill
No law and no bill
- Law
- None found
- We searched the text of every 2025 and 2026 bill and amendment for the phrases "portable solar", "plug-in solar" and "balcony solar" and found none.
- Until a law passes, ask your utility before you plug anything in.
Checked on the Florida legislature’s website on October 9, 2026: the official record
Kansas No bill
No law and no bill
- Law
- None found
- We searched every bill, statute and committee document of the 2025-2026 Kansas Legislature for the phrases "portable solar", "plug-in solar", "balcony solar" and "solar generation device" and found none.
- Until a law passes, ask your utility before you plug anything in.
Checked on the Kansas legislature’s website on October 19, 2026: the official record
Kentucky No bill
No law and no bill
- Law
- None found
- We searched the full legislative record of the 2025 and 2026 Regular Sessions, every bill and amendment, for the phrases "portable solar", "plug-in solar", "balcony solar", "solar generation device" and "plug-in photovoltaic" and found none.
- Until a law passes, ask your utility before you plug anything in.
Checked on the Kentucky legislature’s website on October 19, 2026: the official record
Louisiana No bill
No law and no bill
- Law
- None found
- We searched the full text of every bill in the 2025 Regular, 2025 First Extraordinary and 2026 Regular Sessions for the word "solar" and read the closest matches. None is about plug-in or portable solar.
- A 2026 House resolution (HR 197) asks the Public Service Commission to study home solar and batteries and report before the 2027 session. It does not change the rules.
- Until a law passes, ask your utility before you plug anything in.
Checked on the Louisiana legislature’s website on October 19, 2026: the official record
Nebraska No bill
No law and no bill
- Law
- None found
- We read every copy of every 2025 and 2026 bill that Nebraska's keyword search returned for solar and plug-in terms, 54 documents in all. None contains "portable solar", "plug-in solar", "balcony solar" or "solar generation device".
- The nearest, LB 137 (2025), would stop homeowners associations banning solar panels in general. It was not passed.
- Until a law passes, ask your utility before you plug anything in.
Checked on the Nebraska legislature’s website on October 19, 2026: the official record
Nevada No bill
No law and no bill
- Law
- None found
- We read the title and summary of every bill in the 2025 regular and special sessions, and the full text of the closest solar bills. None is about plug-in solar.
- The Nevada Legislature does not hold a regular session in 2026; the next one starts in 2027.
- Until a law passes, ask your utility before you plug anything in.
Checked on the Nevada legislature’s website on October 19, 2026: the official record
North Dakota No bill
No law and no bill
- Law
- None found
- We read the full formal title of every bill in the 2025 Regular Session and the January and September 2026 special sessions, 1,104 in all. None mentions solar.
- Until a law passes, ask your utility before you plug anything in.
Read the full North Dakota page
Checked on the North Dakota legislature’s website on October 19, 2026: the official record
Tennessee No bill
No law and no bill
- Law
- None found
- We searched the subject and summary of every 2025 and 2026 bill for "solar" and "photovoltaic". The five results are about solar farms, solar sales and roof coatings, not plug-in solar.
- Until a law passes, ask your utility before you plug anything in.
Checked on the Tennessee legislature’s website on October 19, 2026: the official record
Texas No bill
No law and no bill
- Law
- None found
- We searched the text of every 2025 bill for the phrases "portable solar", "plug-in solar" and "balcony solar" and found none.
- The Texas Legislature does not hold a regular session in 2026; the next one starts in 2027.
- Until a law passes, ask your utility before you plug anything in.
Checked on the Texas legislature’s website on October 9, 2026: the official record
Wisconsin No bill
No law and no bill
- Law
- None found
- We searched every Wisconsin legislative document, including bill text and amendments, for the phrases "portable solar", "plug-in solar", "balcony solar" and "solar generation device" and found none.
- 2025 bills on net metering for rooftop solar (SB 892 and AB 901) are not about plug-in kits.
- Until a law passes, ask your utility before you plug anything in.
Checked on the Wisconsin legislature’s website on October 19, 2026: the official record
Every detail above comes from our own reading of the state’s law or bill record on its legislature’s website, on the date shown. Last checked October 19, 2026. Not legal advice: laws change, and your utility and local codes may add requirements. States not listed are ones we have not yet checked.
What most of these laws have in common
- A size limit. Usually 1,200 watts. Colorado allows 1,920 watts to the grid, and Maine allows 420 watts on your own and up to 1,200 watts with a licensed electrician.
- A certified kit. The laws we have read require certification by UL or another nationally recognized testing laboratory, though Maine also accepts a kit configured to the National Electrical Code. Vermont, Maine and New Jersey name UL 3700, the standard for plug-in solar systems.
- Protection in a power outage. Most of these laws require the kit to stop sending power when the grid goes down.
- No utility approval. None of the laws we have read lets the utility require its approval, and all limit the fees it can charge. Several let the utility ask you to tell it about the kit, and Virginia and Maryland require you to tell it before you install.
- Little or no payment for power you send to the grid. Several states, including Utah and New Jersey, keep kits out of net metering, Vermont says exported power is not paid for, and Connecticut warns that it may be charged to you as usage on a standard meter.
How we check
For each state we open the enacted law on the legislature’s own website, read the definition of a plug-in device, the limits and the duties it sets, and record the date we read it. News stories and other trackers are only leads. When we found differences, we went with the law: some trackers name the wrong Maryland bill, and several list New York as legal before its Governor has signed.
Questions people ask
What if my state is not listed?
It means we have not finished checking it yet, not that it bans plug-in solar. We are working through every state. Until we have, ask your electric utility before you plug anything in.
Do I need permission from my utility?
In the states we have read, the utility cannot require its approval, and the fees it can charge are limited. Some states still require you to notify the utility, before installing in Virginia and Maryland, and within 30 days in Maine for kits over 420 watts. Check your state’s card above.
Can I use plug-in solar if I rent?
Some states say so directly. Virginia stops landlords with more than four units from banning a kit outside your unit, though they can set reasonable rules. Vermont lets you go ahead after 10 days’ notice if your landlord does not respond. New Jersey stops landlords banning a kit in your home, including a balcony or patio, if you pay your own electric bill, after 14 days’ written notice. Elsewhere, ask your landlord first.
Information only, not legal advice. Laws change and your utility, local codes and lease may add requirements. Always check the official source before you buy.